Passa al contenuto
Menu
È necessario essere registrati per interagire con la community.
La domanda è stata contrassegnata
1611 Visualizzazioni

Please help to find a solution to scheduling the Parent WO (1-st level) after Child WO (in 3 levels).
Level 4 raw materials are processed to obtain Level 3 pieces
Level 3 pieces are processed to obtain Level 2 elements
Level 2 elements are assembled finally to obtain Level 1 Final Products

BOM for Parent WO show correct relations at all 4 levels, but scheduling in Gantt starts for each of 4 levels same initial date and time.
The scheduling plan is working well just inside each level BOM between the work operations, not being linked to need time for manufacture for previous level articles.
Tanks a lot


Avatar
Abbandona
Post correlati Risposte Visualizzazioni Attività
1
set 24
3565
1
nov 21
2044
0
apr 20
2023
2
mar 18
6146
3
dic 24
5031