Passa al contenuto
Menu
È necessario essere registrati per interagire con la community.
La domanda è stata contrassegnata
1 Rispondi
2093 Visualizzazioni

Odoo already manages very well the standard subcontracting flow where you sell products for which you outsource the production to a third party and you resupply them with materials you buy and have in your stock. But how do we deal with the situation when you are the third party?

Avatar
Abbandona
Autore Risposta migliore

Use case: furniture industry where you manufacture furniture by assembling materials received from the customer.

Product: Table

Components:

  • Table top - 1

  • Table leg - 4


  1. Differentiate between the standard manufacturing flow (you manufacture with products you store in your stock without any reception beforehand) and the subcontracting flow using a new internal location

  2. Create new operation types to link this new location and to manage:

    1. reception of materials from customers to your new location

  1. manufacturing process for subcontracting operation (production) in the new location

  1. delivery of finished product from the new location back to the customer


  1. Create new routes based on your operation types

    1. Subcontracting (MTO) > the sale of the finished product will trigger the subcontracting manufacturing operation

  1. Manage materials > since when you manufacture, components are needed in your new subcontracting location, the demand will be fulfilled from the customer location


  1. Apply the correct route to the products

    1. Finished product

  1. Components


  1. Test the flow: https://watch.screencastify.com/v/t2woWDAj5mNa8kWDKH3i




Avatar
Abbandona

Hello
I have runned the same example but transfer is not created for the components pick up from customer from manufacturing order can you please help me as soon as possible?

Post correlati Risposte Visualizzazioni Attività
2
mar 25
741
1
set 22
2543
1
feb 22
1852
2
feb 24
4111
2
feb 24
1702