In this video, learn the basics of Overall Equipment Effectiveness (OEE) and manufacturing efficiency in Odoo.
評分
0
0
暫時沒有留言。
參加此課程
成為第一個留言的人。
1.
Your work center’s OEE is at 84.91%. What will the OEE percentage color be if your target is 85%?
2.
It took you 20 minutes to manufacture a product, but the expected duration to produce it was 15 minutes. What will Odoo record for the five additional minutes?