I have a question about using Manufacturing modul in our database. Is there a way how to produce partial quantity of a product which is made by work orders?

Let´s say that to produce our product we use manufacturing orders which are done in 2 operations (production and packing) in different work centers. If I create manufacturing order to make 10 of those products it creates work order to produce 10 products. In routing I have set that it goes to next operation once a minimum number of products is processed. So if I finish 5 of the products it creates the work order to pack 10 of those products. There is first question - is there a way how to create work orders for next operations based on the number which was created in previous operation (in our situation it should create just work order to pack just 5 of our products). The second issue is that if I go to work order packing and I finish let´s say those 5 products they will not show in totall quantity of the product untill I will finish all manufacturing order (packing of 10 products and close MO). Is there way how to do it?

Thanks!

形象
丢弃

Which version are you using?

最佳答案

1. Is there a way how to produce partial quantity of a product which is made by work orders?

Yes 

  • Create a manufacturing order, 

  • generate a work order, 

  • start production, 

  • complete partial production, 

  • return to manufacturing order, 

  • then "post inventory".

2. Multiple pack routing work orders?

Typically, we use workstation spec sheets to identify packing arrangements.

Have you been able to create a single work order to accomplish the packaging?

形象
丢弃

This sounds like version 13, but you can't do that in 14 or later.

最佳答案

Basically the answer to both your questions is NO. Not possible.  Very little flexibility on the manufacturing module in Odoo.