İçereği Atla
Menü
Bu soru işaretlendi
2315 Görünümler

The Field Service tasks are the same as in the Project app, but I need them to be customized according to the stage of field service being performed. I tried it through Studio, but I couldn't understand the logic of what needs to be done. Has anyone ever experienced this?


Odoo 14

Avatar
Vazgeç
İlgili Gönderiler Cevaplar Görünümler Aktivite
1
Şub 25
1250
1
Oca 24
3790
0
Kas 23
2005
1
Nis 23
3079
2
Ara 24
2799