Skip to Content
Menu
This question has been flagged
4614 Zobrazenia

Hi, I'm trying to configure manufacturing of a batch of product where the finished product is placed into containers of a specific size. Is there a way to model this ? 

The other thing I need to model is that some batches do not produce exactly full containers, and these incomplete batches are occassionally combined to produce a full container. How can this be modelled / configured ?

Thanks.

Avatar
Zrušiť
Related Posts Replies Zobrazenia Aktivita
2
jún 24
7508
3
sep 25
271
1
sep 25
309
0
aug 25
382
2
aug 25
932