Skip to Content
Menu
Musisz się zarejestrować, aby móc wchodzić w interakcje z tą społecznością.
To pytanie dostało ostrzeżenie

Hello...


I want that when selecting a "Print Roll", in a Manufacturing Order, some Work Centers in the work orders are updated.


"Print Roll" is a custom module that I created through Odoo Studio, which in my workflow, would be related to a Production Center.


So, by assigning the Production Order a "Roll", this would mean that certain operations would be performed in a specific module, therefore I would like to reduce the step of manually selecting the Production Center for said operation.


Here I made a video to show:

https://youtu.be/xXt4nr66uH4


Regards.

Awatar
Odrzuć
Powiązane posty Odpowiedzi Widoki Czynność
0
gru 24
608
2
gru 19
3598
1
kwi 22
3216
1
wrz 24
1048
1
sie 24
1356