Skip to Content
Menu
Musisz się zarejestrować, aby móc wchodzić w interakcje z tą społecznością.
To pytanie dostało ostrzeżenie
1 Odpowiedz
7944 Widoki

I have a product BoM structured (as shown in 'Product BoM Structure' menu item) like this:

  • Main product
    • Component 1
  • * * Subcomponent 1
    • Component 3
    • Component 4
    • Component 5
    • Component 6
    • Component 7
  • * * Subcomponent 2
  • * * * Subsubcomponent 2
    • Component 10
    • Component 11

When a manufacturing order is issued for Main product the stock won't get cascaded for deduction, and only the top level products are picked. As a result the Subsubcomponent 2 stock will remain as nothing has happened.

Is this the correct behavior? What can be wrong here?

Awatar
Odrzuć
Najlepsza odpowiedź

Hello Vinicius,

I believe this is the expected behavior indeed: with normal Bill Of Materials, each Bill Of Material is assembled in a new production order. So to produce your top level product, the "level 1" components will be required in some production order.

Then the scheduler will eventually create draft purchase orders or draft production orders to produce the components required in this production order at "level 1". Of course, you also need to properly define what will happen with the level 2 components: are them taken from stock? produced? bought?

Now, you can have OpenERP require all components at once no matter the depth if you use a special kind of Bill Of Material, the "phantom BOM". You can read more about phatom BOM's here: doc.openerp.com/7.0/book/5/5_15_Manufacturing/5_15_Master_data/#phantom-bills-of-materials

Hope this helps

Awatar
Odrzuć
Powiązane posty Odpowiedzi Widoki Czynność
1
lis 21
13186
0
mar 15
4676
4
sie 15
10125
2
lip 25
375
2
sie 24
4179