Dear members,

In creating a manufacturing order i want to calculate the work center cost, as well as the labor cost with the materials cost, in order to have the full cost of the product.

Any one have an idea to do the right configuration? I'm using odoo 8

Thanks 

Avatar
Buang
Jawaban Terbai

probably in v8 not possible. May be you can improve BOM cost structure report to calculate the total cost of components + workcenter cost.