Greetings,
I have series of
In a series of BOM
A→B→C→D→E→F
How can the Manufacturing order trigger the subsequent Flow
Example:
1. When manufacturing order for F is placed flow should be
A→B→C→D→E→F
2. When manufacturing order for D is placed flow should be
A→B→C→D
And so on
How can i do so??
Currently it is generating new order for the subsequent flow
Example when i want to Produce E
(Expected: A→B→C→D→E)
But
D→ E
And it is creating a completely new Manufacturing Order for C when replenished form the Overview
(NOTE: Each Operations are applied in different work Center)