Greetings,


I have series of


In a series of BOM


A→B→C→D→E→F


How can the Manufacturing order trigger the subsequent Flow


Example:


1. When manufacturing order for F is placed flow should be

A→B→C→D→E→F


2. When manufacturing order for D is placed flow should be

A→B→C→D


And so on

How can i do so??



Currently it is generating new order for the subsequent flow


Example when i want to Produce E

(Expected: A→B→C→D→E)

But

D→ E

And it is creating a completely new Manufacturing Order for C when replenished form the Overview
(NOTE: Each Operations are applied in different work Center)

الصورة الرمزية
إهمال
أفضل إجابة

Since you are using the manufacturing module, try out the module: MO and BoM variance whose author is intelliVersal integrated solutions. This module generates a variance analysis report showing the quantity and cost differences between BoM and actual MO.

الصورة الرمزية
إهمال
أفضل إجابة

Since you have a clear idea what is the flow of the order, adding that information to the manufacturing process would simplify the validation to where should the manufacturing order stop, without having to configure extra requests, and just keep the normal flow from A to F.


الصورة الرمزية
إهمال
الكاتب

Problem with that is there is meshed network of more than 100 products, so i chose this approach.
any opinion on this André Canilho??

أفضل إجابة

If you are using reordering rules and running replenishment it only looks one level behind.  So when there it will only be a requirement for product C, after the order for product D is created.   

If you use the automatic job for replenishment, a solution might be to run it more frequently.  By default it is set to run once a day.  To adjust: be in developer mode. Go to: Settings -> Technical -> Scheduled actions and look up 'Procurement: run scheduler'.

The other option is to set all the components with Make to Order. Then if you create an order for product D, it will create child orders for product C -> B -> A.   But the all the orders are linked, and that can have some disadvantages.