跳至內容
選單
此問題已被標幟
2 回覆
2217 瀏覽次數

The documentation talks about semi-finished products.


https://www.odoo.com/documentation/15.0/applications/inventory_and_mrp/manufacturing/management/sub_assemblies.html


But what if you want to use such 'composite' boms at a subcontractor.


Say i have a product 'Steel table', it consists of legs and a table top. So it is a BoM, subcontractor, and i supply the products to my subcontractor. All is fine.


Now i want to also create a product "Painted steel table" with 3 colors.

So i create a BoM for these variants. With a steel table inside and the product has the cost for the spray painting.


Now the subcontractor can 'prepare' steel tables. and when an order comes in for a 'blue' one, it can take one from its stock and spray paint it.


I don't manage to this to work automatically. So when i order a 'steel table colored blue' it will automatically make a subcontractor/manufacturing order for the normal steel table, in case there are none in stock with the subcontractor location.

頭像
捨棄
最佳答案

You may want to refer to a recent post on multi-level BOMs at sub-contractor location and apply these concepts to configure inventory routes and operations specific to your business flows and your products.

https://www.odoo.com/forum/help-1/how-to-configure-multi-levels-of-boms-at-the-subcontractor-s-location-200188

頭像
捨棄
最佳答案

   HI 

Can you clarify the automation you need in this issue 

頭像
捨棄
相關帖文 回覆 瀏覽次數 活動
1
8月 22
3656
1
5月 22
2268
2
7月 18
2712
1
5月 25
794
3
5月 25
2301