Hi in inventory module, we assign GL code 'material cost' and 'standard cost' to virtual location/production to track consumed material and output product cost. As we have three different types of manufacturing operations, we would like to have three virtual locations for production and assign different GL codes to track consumed material and output product cost from each location. Is there a solution to that? 


I tried to create new manufacturing routes and assign different operation types, this method can create different types of work orders but i don't see how to link it with virtual locations.


For example, we have operation types - Coating and Slitting and hence created two manufacturing routes - Coating and Slitting.  When issue material to Coating, we would like to have the accounting entry

 debit. material consumption - coating   credit. inventory

currently this only create the entry

 debit. material consumption credit. inventory

and can not specify material consumption account for different operation types. 

I would appreciate the advice. 


thanks

  